Covenant Applications
All non-routine applications (including HVAC related) must be submitted ten working days prior to a scheduled Covenants Committee meeting.
Covenant Specifications
- AR #2 Design Review Procedures & Guidelines rev 8.2020
- Air Conditioner and Heat Pump Specifications rev. 12.2019
- Back Door Specifications
- Breezeway Fence Removal Specifications
- Cable TV/Telephone Wires and Service
- Carpet Specifications
- Common Element Planting Specifications
- Communication Equipment and Cable Specifications
- Dryer Vent Specifications
- Electrical Receptacle Specifications
- Exhaust Fan Specifications
- Front Door Package
- Front Exterior Lighting Specifications
- Gates, Arbors, Trellises Specs
- Window Specifications rev. 2023
- Limited Common Element Rear Patio and Deck Package
- Rain Barrel Specifications
- Rear Exterior Lighting Specifications
- Screen/Storm Door Specifications
- Satellite Dish and Antenna Specifications
- Stoop and Porch Railing Specifications
- Ventless Washer/Dryer Specifications
- Walkway Specifications
- Condensing Washer/Dryer Installation Specifications
- Washer/Dryer Installation Specifications
- Water Feature Specifications
- Window Security Guard Specifications
- Wooden Deck Specifications
HVAC Installation Instructions
- Central HVAC Installation Location by Unit
- HVAC System Specification Letter
- HVAC Installation Instructions
- Masonry Contractors
- Central HVAC Specification Rev 2019
- Central HVAC Specification with Ductwork Draft rev 2019
General guidelines and resolutions about: caring for common space, gardens, patios, antennas, grills, etc. can be found under the About Parkfairfax tab in the Governing Documents section, Resolutions, Administrative Resolutions, AR#2.